Showing results 1 to 2 of 2

Thread: Report Viewer Cell Calculation

  1. #1
    Join Date
    07.05.2018
    Posts
    24

    Default Report Viewer Cell Calculation

    Hello Dear Friends,

    In report viewer, I prepared a template for archive values hourly reports like below. I can run the report with 1st and 2nd columns but if I add 3rd column with formula, it is not working.

    How can I solve this issue?

    Thanks.

    1st col       2nd col               3rd col
     Hour     Counter Value       Difference
    00:00           15                 25-15=10
    01:00           25                 35-25=10
    02:00           35                 45-35=10
    03:00           45                 55-45=10
    04:00           55             (05:00.Value)-45

  2. #2
    Join Date
    01.07.2008
    Location
    Salzburg, AT
    Posts
    1,107

    Default Re: Report Viewer Cell Calculation

    what is the column format, maybe you forced to have text, not numbers?

Similar Threads

  1. Reg: In Report particular cell value is corrupted
    By saravanan1985 in forum Engineering Studio & Service Engine (former zenon Editor & Runtime)
    Replies: 1
    Last Post: 18th April 2019, 13:33
  2. Reg: In Report particular cell value is corrupted
    By saravanan1985 in forum zenon Energy Edition
    Replies: 1
    Last Post: 18th April 2019, 13:33
  3. Reg: Report value corrupted in particular cell
    By saravanan1985 in forum Engineering Studio & Service Engine (former zenon Editor & Runtime)
    Replies: 0
    Last Post: 16th April 2019, 10:10
  4. Report cell
    By DavidMarek in forum Engineering Studio & Service Engine (former zenon Editor & Runtime)
    Replies: 0
    Last Post: 4th May 2016, 11:32

Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •